Installing a Solar System Yourself? Here’s What You Need to Know (Pt 1)

ana luy potential solar blonde girl
Ana Luy
October 27, 2026
•
8 min read

Summary

Thinking about installing your own solar system in Alberta? There’s plenty to sort out before you get on the roof. This guide walks through system design, municipal permits, utility approvals, project documentation, equipment purchasing, and electrical planning. It also covers easy-to-overlook costs, critter guard, and warranty considerations.

Thinking about installing your own solar system in Alberta?

I completely understand the appeal. I installed my own system too, although I do own a solar installation company, so I went into it with a very different starting point.

And even with that experience, I can tell you two things right away: it will take much longer than you think, and there are so many steps to installing a solar system. This is definitely not as simple as mounting panels on your roof and adding a breaker to your main electrical panel. I would 100% recommend hiring an experienced solar installer to do it properly.

But if you have decided you are doing this yourself, I will walk you through the steps, and share the advice I wish every homeowner had before starting a DIY solar project in Alberta.

Good to know before you start: the installation itself is only one of the last pieces of the puzzle. Long before the first solar panel gets mounted, you will need designs, permits, utility approvals, and technical documentation. So before we get into the actual solar installation steps, let’s start with the ingredients you need to gather first.

1. Design Your Solar System

The first thing you need to do once you decide to go solar is a properly designed solar system. The information you will need for the design is:

  • A. Take a look at your roof space and find the best solar faces (in order: South > South West > South East > East or West).
  • B. Add your last 12 months of consumption – this number should be in the thousands and the unit should be in kWh.
  • C. Find a good match between the right solar panel with the right inverter. This might be the trickiest part, as you’ll need to understand amperages, voltages, DC:AC ratio, and be able to read component data sheets.
    Here’s what we usually use: Longi 505W panels (LR8-54 HGBB) paired with Enphase IQ8HC microinverters (1 per solar panel)
  • D. Map your roof including vents, chimneys and look for trees that might shade panels. We use Aurora Solar as our modelling tool, but you can use the Open Solar software (which is free).
  • E. Make sure on your design to not only include the size of the panels, but give 0.5 inches between each panel for clamps!
  • F. For each roof face you are putting solar panels on, make sure to note down the azimuth (degrees from North) and tilt (roof pitch).
  • G. Many times, you’ll be asked to provide load calculations to make sure your roof can handle the solar. To calculate this take number of panels x (mounting talons + clamps + rails + microinverter weight) / square footage of modules
  • H. Use the Open Solar model to estimate your system production.
  • I. Make sure your design offsets around 102-105% of your consumption. More than 105%, and your application in Alberta will come back rejected.

Design Tips!

  1. Consider the age and condition of your roof. We recommend installing on roofs that are max 10 years old.
  2. Leave 1 and a half to 2 ft clearance from roof edges to have enough space to install and maintain your system – you will thank me when doing critter guard!
  3. Once you have your design, go to Fast Rack to get the bill of materials for the mounting system!

2. Find out Which Permits You Need

One of the biggest misconceptions about DIY solar is that Alberta has a single approval process. It doesn’t.

Every municipality has its own requirements, forms, and approval process. The first thing you’ll need to do is determine which municipality or county your property falls under and review their solar permitting requirements.

For homeowners in Calgary, you’ll typically need:

  • An electrical permit
  • A Microgeneration Application with ENMAX

However, there is an important catch: Homeowners cannot pull a solar electrical permit in Calgary. This means you’ll need a Master Electrician to pull the permit and complete the final electrical connections required to energize the system.

Outside Calgary, requirements can vary significantly. Depending on the municipality, you may also need:

  • A development permit
  • A building permit
  • A structural assessment of your roof
  • Additional engineering documentation

Many municipalities now manage applications through online portals, but each one is slightly different.

The utility approval process also depends on where you live:

  • Calgary homeowners typically work with ENMAX.
  • Many rural Alberta properties are serviced by FortisAlberta.
  • Edmonton-area properties may require applications through ATCO.
  • Lethbridge operates its own utility system.

Permitting Tips!

  1. Do not start installing your system before your permits and utility approvals are in place.
  2. Make sure you know which documents you need and what they need to look like before you start applying to avoid delaying your timeline

3. Put Together a Complete Solar Project Package

A complete project package typically includes:

  • A Site Plan including the roof layout showing the placement of the solar panels, azimuth, tilt and loading calculations
  • Production and consumption modelling
  • Estimated project cost
  • A Single Line Diagram (SLD)
  • Component specification sheets and datasheets

Site Plan Tips!

  1. Make sure you know wire sizing when building your single line
  2. This Voltage Rise Calculator will help you if you’re in Fortis territory
  3. When estimating the project cost, make sure you add the solar panels, inverters, mounting, permits, labour and electrical work.

4. Purchase your Components

Once your permits and applications are underway, you can start sourcing equipment. This is where many DIY projects run into trouble.

Please purchase components from Canadian suppliers that are certified for use in Canada. Permit applications will come back rejected if components do not meet regulatory certifications.

I’ve seen homeowners find a great deal online, import equipment from another country, and then discover that their permit or utility application gets rejected because the equipment isn’t approved for Canadian installations. At that point, the “great deal” becomes a very expensive mistake.

Purchasing Tips!

  1. Make sure your equipment carries certifications accepted for use in Canada.
  2. Before mixing and matching panels, optimizers, inverters, batteries, or monitoring equipment from different manufacturers, verify compatibility with the manufacturer and review the technical documentation carefully.
  3. Do not, I repeat, DO NOT SKIP BUYING CRITTER GUARD.

Seriously.

Buy critter guard.

Install critter guard.

I don’t care if you’ve never seen a pigeon where you live. They will find your solar system.

Critter guard prevents birds and other animals from nesting underneath your solar panels, which can lead to damaged wiring, debris buildup, and ongoing maintenance headaches. It is one of the cheapest parts of a solar system and one of the best investments you can make.

Future you will thank you.

5. Purchase your Electrical Components

Many DIY solar projects focus entirely on the roof and forget about the electrical system the solar will connect to. Available breaker space, panel ratings, and electrical code requirements can sometimes require modifications or upgrades before solar can be connected.

This is another reason why involving an experienced electrician early in the process can save a lot of headaches.

You will need cables, breakers, engraved lamacoid warning labels (they may seem like a small detail, but inspectors take them seriously) and a lot more electrical equipment and tools than you think you will. Save yourself from spending over $4,000 at Home Depot and bring in an experienced solar electrician.

What About Warranties?

Before you decide to DIY, check the manufacturers’ warranty terms for every component — especially the inverters. Some equipment requires installation by an installer certified for that brand, and installing it yourself could void the warranty. You may still receive equipment warranty coverage, but don’t assume it applies without checking those requirements first.

You will also not be getting the installer’s workmanship warranty.

If a roof penetration leaks, wiring is damaged, a mounting component comes loose, or another installation-related issue shows up years later, troubleshooting and repairs become your responsibility.

That’s not necessarily a reason not to DIY your system, but it’s definitely something you should factor into the decision.

Final Thoughts

Installing your own solar system is absolutely possible, but it’s much more than simply mounting panels onto a roof.

Before installation begins, you’ll need a complete design package, municipal approvals, utility applications, Canadian-certified equipment, inspections, and a solid understanding of how your home’s electrical system fits into the project.

Get those pieces right, and you’ll set yourself up for a smooth solar installation.

Get them wrong, and you may find yourself stuck in permit revisions before you’ve even installed your first panel.

My advice? Before you commit to DIY, ask yourself whether you’re ready to take on the planning, paperwork, and responsibility for the installation — not just the work on the roof. If you’re still keen, use this guide to work through the preparation first. If you’re having second thoughts, I still recommend bringing in an experienced solar installer. You don’t have to do every part yourself to be involved in the project.

Coming soon: DIY Solar Installation in Alberta Part 2, How to Actually Build the System.

Read Other Similar Articles

Person with a smiley-face cardboard box over their head taps their temple with a pencil while holding papers, on an orange background.
6 min read
Sep 2026

Solar Warranties Explained: Panels, Inverters, Labour & Performance Guarantees

solar panel in dark orange background with an oragne graph that plateaus, a girl pointing at the text solar clipping with the g falling
5 min read
Sep 2026

Solar Clipping: What It Is, Why It's Normal, and What It Means for Your Solar System

solar 101

Compare solar systems, inverter options and pricing factors so you can choose with confidence.

contact us

Get a custom solar design and proposal from us, with financial calculations and financing options.

pricing

Estimate your system cost and ROI in minutes with our solar calculator.

Frequently asked questions

Does installing solar myself void the warranty?

It can. Some equipment must be installed by a certified installer, and you also lose the installer’s workmanship warranty.

What permits do I need for solar in Alberta?

It depends on the municipality. In Calgary it’s an electrical permit plus an ENMAX microgeneration application. Elsewhere you may also need development or building permits, a structural roof check, or engineering documents.

How big can my solar system be?

Aim for about 102–105% of your annual use. Above 105%, the application might be rejected.

What does the solar installation process look like, from quote to final walkthrough?

It typically runs in five steps: a site visit where one of our engineers assesses your roof and electrical service, a custom system design and proposal, permitting (we handle all of it), a 1-3 day install by our crew, and a final walkthrough where we show you the monitoring app and answer every question. Most residential installs are completed on-site in a day or two; permitting timelines vary and are usually the longest part of the process.